内页banner
Location:Home - News
News
News

How to install aluminum alloy skirting line? Here comes the detailed introduction!

Views:671 Author:Site Editor Publish Time:2022-05-19 09:18:47 Orgin:Site
share

微信图片_20220518161143.jpg


As a new decorative material, aluminum alloy skirting line is deeply loved by the public because of its good decorative effect, high strength, strong flexibility, simplicity and fashion. At the same time, it can also make the cleaning work easier and simpler.


微信图片_20220518161207.jpg


The installation of aluminum alloy skirting line is carried out in the later stage of general home decoration and before the furniture enters the site. So how to install aluminum alloy skirting line? Next, I will introduce the installation steps and precautions of this aluminum alloy skirting line.


微信图片_20220518161209.jpg

Buckle aluminum alloy skirting line



01· Preparation


微信图片_20220518161212.jpg



A.Inspection and cleaning

Remove the protruding cement floating blocks on the wall, corner and root of the wall where the aluminum alloy skirting line is installed; Check the flatness of the wall. The maximum gap is no more than 3mm. Plug it with a coin of 1 yuan. If there are more than 2 after inserting, the gap may be too large. Otherwise, the convex part of the wall shall be leveled and the concave part of the wall shall be padded.

For example, for wall corners with a gap greater than 3mm below, the gap can be filled by glue before installation.


微信图片_20220518161216.jpg

Customer case



B.Select installation tool

Installation tools: cutting machine, electric drill, screwdriver, hammer, tape measure, etc.

Because the price of the cutting machine is slightly higher, if you plan to install it yourself, it is recommended that you ask the merchant to help cut it when you buy it.

C.Make positioning ruler

When installing the buckle of aluminum alloy skirting line, use the positioning ruler to determine the installation position and height of the buckle. The length of the positioning ruler is 1000 ~ 2400mm; 40 ~ 50mm wide; The height depends on the model of aluminum alloy skirting line, and the positioning ruler can be made of wood or iron.



02 · Install the snap



Layout trend

微信图片_20220518161218.jpg

Position of fixing clip

微信图片_20220518161222.jpg

Buckle spacing


1.Installation method I

Fixation of cement row nails: put the buckle on the positioning ruler against the wall root, press the upper end of the buckle with your fingers, and fix it with a nail gun.

The length of cement row nails is 32mm, and the buckle spacing is about 400mm. There should be one buckle at the interface of two aluminum alloy skirting lines, and one buckle at the end of the wall about 30mm.


2.Installation method II

Punching and fixing of percussion drill: fix a drilling jig on the positioning ruler (the diameter of the drilling jig hole is slightly larger than the percussion drill), press against the wall root, and use the percussion drill to drill holes on the wall; Insert wood needle or plastic expansion tube into the hole. When fixing the buckle of aluminum alloy skirting line, it is still necessary to adjust and fix it at the same height with the locating ruler buckle (using the waist round hole on the buckle). The rest are the same as above.



03 · Installation profile


微信图片_20220518161224.jpg

Profile assembly effect

1.jpg

Accessory combination



a

After ensuring that all snaps have been installed on the same straight line (error 4.5mm), if the profile is not cut, cut it according to the size (leave about 2mm joints for silica gel mud joints) and grind off the burrs.


b

Hang the groove of the aluminum alloy skirting line of the lower size in an inclined half on the upper opening of the buckle, then lift the rear end of the aluminum alloy skirting line up a little, and then stick it to the wall and press it down to make the convex card on the upper part of the buckle fully enter the groove on the aluminum alloy skirting line, and tap the middle part of the aluminum alloy skirting line at the same time.

When installing, start from one end, press one snap into the other end step by step, and do not hammer. Finally, install internal corners, external corners and other accessories.


c

After installation, the gap between the aluminum alloy skirting line and the wall and ground shall be sealed with beautiful seam glue, and the internal and external corners and the 2mm gap reserved for flat connection shall be pasted with beautiful paper or mended with beautiful seam glue.


d

Tear off all protective films of aluminum alloy skirting line, wipe off the residual glue of aluminum alloy finish with old powder, and remove the black spots formed by glue heating at the incision with wire drawing cloth.



04 · Maintenance method

 

1.Scrub with soft cloth and towel.

2.Regular cleaning is required.

3.It is strictly prohibited to loosen the bulk truck and cause bumps.

4.Do not use acidic and alkaline cleaning agents.

5.The surface pollution shall be cleaned in time, first with alcohol and then with clean water.


微信图片_20220518161229.jpg


When installing the aluminum alloy skirting line, pay attention to the installation steps and precautions. If it is the first time to install the aluminum alloy skirting line, it is best to invite professionals to install it, so as to avoid incorrect installation and affecting the beauty of the skirting line installation. Pay attention to the dust removal of skirting line at ordinary times.

Reprint rainbow line

 

 



Return